Northwestern University Lab Renovation

October 20, 2006

Taking Shape

Filed under: Uncategorized — owenpriest @ 2:20 pm

With more hoods installed, the lab begins to take shape.

October 13, 2006

More Hoods

Filed under: Uncategorized — owenpriest @ 4:16 pm

More hoods being installed on the benchtops.

October 10, 2006

HVAC Installation

Filed under: Uncategorized — owenpriest @ 4:25 pm

Here you can see part of the HVAC system being lifted by a crane up onto the penthouse for installation.

September 22, 2006

Installation of New Hoods

Filed under: Uncategorized — owenpriest @ 1:37 pm

Here you can see the new hoods being installed on the benchtops.

September 18, 2006

Benchtop Installation

Filed under: Uncategorized — owenpriest @ 2:33 pm

September 10, 2006

Installation of Lockers

Filed under: Uncategorized — owenpriest @ 2:41 pm

August 17, 2006

Tech Drive Road will be closed Aug 23 for use of crane lift

Filed under: Uncategorized — owenpriest @ 1:58 pm

On Wednesday Aug. 23, the Tech drive will be closed to through traffic between Sargent Hall and Tech D wing due to a crane lift of air handler units for the Tech Organic Teaching lab. The lifts will occur between 8:00 AM and 4:00 PM.


July 11, 2006

Air Ducts on Rooftop

Filed under: Uncategorized — owenpriest @ 7:08 pm

June 15, 2006

Framing Walls

Filed under: Uncategorized — owenpriest @ 12:53 pm

Here you can see the new walls being framed out with metal studs. 

New Ductwork

Filed under: Uncategorized — owenpriest @ 12:49 pm

New ductwork going up on ceiling. 